My Business
Contracts & change orders
Lock it in, track every change
Turn an estimate into a legally binding contract with signatures. When the scope changes mid-job, add change orders straight to the contract, approved by default, without needing an invoice first.
Turn an estimate into a contract
Convert any estimate directly into a contract. The scope of work carries over: every group and line item with its price, plus tax, discount, deposit, notes, and terms. On an estimate with options, only the options you pick carry over. A beautiful PDF is generated automatically.
- Open an estimate and tap “Convert to Contract”.
- Preview the generated PDF that includes your business branding, client details, scope groups, and signature blocks.

Sign on Device or mark signed
Capture a physical signature on the spot, or mark it as signed if you received authorization by phone or email.
- Tap “Sign on Device” to hand the device to your client for a physical signature. The PDF updates immediately.
- Alternatively, tap ••• → Status → “Signed” if you received verbal or email approval, which badges the contract as “Marked Signed (No Signature)”.
- Send the PDF to the client via email or text with one tap.
Manage scope with change orders
When the job grows or shrinks mid-project, draft a change order against the contract. It’s auto-numbered, and prices added or removed work as charges and credits.
- Open the contract and tap “New” in the Change Orders section.
- Change orders are defaulted to approved. You can easily switch their status with the inline picker.
- The contract’s total value updates immediately as change orders are added and approved.
